FOUNDATIONS

Piles

Drilling up to 42 m (138 ft) deep.

Deep cast-in-place reinforced concrete foundations

We have equipment to build drilled shafts (bored piles) cast in place, with drilling capacity of up to 1.5 m (5 ft) in diameter and a maximum depth of 42 m (138 ft).

These are state-of-the-art piling rigs, equipped with digital vertical and horizontal positioning systems that ensure accurate plumbness of each borehole, plus a digital depth counter.

Auger cast-in-place (CFA) pile rig with drilling capacity of up to 1 m (3.3 ft) in diameter, maximum depth 21 m (69 ft)

CFA Piles (Auger Cast-in-Place)

Continuous Flight Auger (CFA) piling — also known as auger cast-in-place (ACIP) piling — is a deep foundation technique that uses a hollow-stem continuous flight auger to drill into the ground. Concrete is pumped under pressure through the hollow stem as the auger is withdrawn, forming the pile before the steel reinforcement is inserted.

Construction Process

Drilling: The auger rotates and penetrates the ground to the required depth without temporary casing or bentonite slurry.

Concrete placement: Once it reaches the bottom, concrete or grout is pumped through the hollow stem while the auger is raised slowly and under control.

Reinforcing cage: The reinforcing cage is plunged into the fresh concrete.

 

Drilled shafts (bored piles)

Deep cast-in-place reinforced concrete foundations